# Build the technical file first. Open the declaration only when the evidence is ready.

> Prepare the PPWR technical evidence pack, Annex VII technical documentation and Annex VIII EU Declaration of Conformity through a local-first guided workflow.

Canonical: https://beyogluprofessional.com/tools/declaration-of-conformity-builder

The technical file and the EU Declaration of Conformity are not the same document.

Annex VII is the evidence-based technical record behind the conformity assessment. Annex VIII is the concise EU Declaration of Conformity issued by the manufacturer once conformity with the applicable requirements has been demonstrated.

## What the builder produces

### Evidence preparation list

Profile-sensitive checklist for supplier documents, tests, traceability and internal records.

### Annex VII technical documentation

Structured technical record with identification, design, manufacturing control, risk assessment, specifications and assessment summaries.

### Annex VIII EU Declaration

Signature-ready declaration in the Annex VIII order, blocked until the required technical gates are closed.

### Authority pack

DoC + technical documentation + evidence index + original evidence files + manifest in one ZIP.

## How to use it

### 01 · Define the packaging

Identify one controlled packaging type or family and the relevant revision.

### 02 · Establish the PPWR manufacturer

Record the legal entity and the factual reasoning behind the manufacturer role.

### 03 · Close evidence and requirement gates

Attach the supporting evidence and document the applicable Articles 5–12 assessment.

### 04 · Export only when ready

Use draft technical exports during preparation; unlock the legal declaration and authority pack when blockers are closed.

## Important boundaries

- Generating a file does not mean the EU, a Member State authority or Beyoğlu Professional approved the packaging.
- Browser storage is a working convenience, not the statutory archive. Keep an independent controlled copy.
- Country language rules remain destination-specific. A working-language PDF is not automatically valid for every Member State.
- Supplier declarations support the technical file but do not automatically replace the manufacturer's conformity assessment.

## FAQ

### Do I need a new DoC for every shipment?

Not as a general rule. Annex VII requires a written declaration for each packaging type. A controlled packaging type can cover repeated production while the conformity basis remains unchanged; changes that may affect conformity require reassessment and, where necessary, an updated declaration.

### Is the DoC an EPR declaration?

No. PPWR technical conformity and national packaging EPR registration/reporting are separate regulatory layers.

### Can I use supplier declarations as the final DoC?

Supplier information can be supporting evidence. The PPWR manufacturer remains responsible for the conformity assessment and the EU Declaration of Conformity.

### Does the builder upload my evidence?

The application is designed local-first. Evidence files are stored in browser IndexedDB and can be exported in a workspace or authority-pack ZIP.

## Builder

[Open the DoC Builder →](https://beyogluprofessional.com/tools/declaration-of-conformity-builder/builder)

## LLM discovery

- Markdown: https://beyogluprofessional.com/tools/declaration-of-conformity-builder/index.md
- llms.txt: https://beyogluprofessional.com/llms.txt
- llms-full.txt: https://beyogluprofessional.com/llms-full.txt
